Abbey Leisure Centre

Project Description:

Abbey Leisure Centre comprises a 25m competition pool, learner pool, fitness suite with 2 studios, café and spa.
 
VZDV is employed by LBBD to produce a RIBA Stage F1 design and provide monitoring services during the construction period. Some of the low carbon features included as part of the design is a gas fired CHP, photovoltaic panels, energy efficient lighting throughout, daylight dimming and switching, heat recovery on ventilation plant and variable speed control on fans and pumps.
 
The facility is due to open in Spring 2014