Atherton Leisure Centre

Project Description:

Mulalley & Company Limited (MCL) has been selected by Newham Borough Council as their development partner to develop the site of the former Atherton leisure Centre. The new development will comprise a new state of the art wet and dry leisure centre, and 9 dwellings.
VZDV has been appointed by MCL as their M&E consultant for the design and development of the M&E and pool water treatment design. VZDV provided early input as part of the detailed planning application and assisted with the energy strategy to ensure compliance with the London Plan. Some of the low carbon initiatives include natural lighting, natural ventilation, lighting controls, energy management controls, heat recovery and variable speed drives. A gas fired CHP will be the primary source of heating to the development. And will be complemented by photovoltaic panels.
The project is due to start on site in 2014.